We have been continuing with our ‘Normansfield – Protecting a Theatrical Past’ project and have now almost completed the external drainage work to both sides of our basement area where our scenery storage rack is based. The drainage team opened and repaired the existing drainage channels and have now connected and installed a sump pump. Work will be completed early in October.
Read the full blog here.